arrow&v

NO DATA HERE YET

PLEASE UPLOAD DRAWINGS FOR THIS PROJECT

svg-charts-loading-gif-5.gif
Upload
Scan
Please upload a pdf file.
Select File
svg-charts-loading-gif-5.gif
Our AI engine is scanning your documents and we will get back to you via email once the system produces the results

ARCHITECTURAL

A1.00

A1.07-Floor Plan Notes

A1.08-General - Fire Department and Construction Notes

A1.09

A2.01-Lower parking garage - P2 level

A2.02-Upper parking Garage - P1 Level

A2.02-Upper parking Garage - P1 Level

A2.04-Ground Floor Plan

A3.04-Exterior Building elevations Courtyards

A3.04-Exterior Building elevations Courtyards

A4.05-Wall Sections

A4.06-Wall Sections

A4.06-Wall Sections

A4.07-Wall Sections

A6.04-Elevator, Trahs Room, Trash Chute Plans and Sections

A8.02-Window Schedule

A8.02-Window Schedule

A8.02-Window Schedule

A8.02-Window Schedule

STRUCTURAL

S2.03-Ground floor framing plan

S3.01-Concrete Section & Details

S4.22-Concrete Slab Sections & Details

Sheet No.
Sheet Title
Discipline
Risk Type
Impact
Risk
blueprint (2).png

A3.04

Exterior building elevations - courtyards

Architecture / Interior Design

SCOPE GAP / MISSING

Wood slates detail show steel brackets and reference structural drawings. No reference of this in the structural drawings.

A-High
blueprint%20(2)_edited.png

A7.04

Enlarged Plans

Architecture / ID / Plumbing

SCOPE GAP / MISSING

ID shows fixtures, but Plumbing doesn't show connection.

A-High
blueprint%20(2)_edited.png

AH12

2D floor plan

Arch/Landscape/ID

SCOPE GAP / MISSING

Conflict on counts and details for site fencing and gates between arch/landscape/ID drawings

A-High
blueprint%20(2)_edited.png

EH311

1st floor electrical lighting plan

Electrical

SCOPE GAP / LACK OF COORDINATION

Light fixture layout and types between RCP and ELEC dwgs

A-High
blueprint%20(2)_edited.png

A4.01

Building Sections

Architecture

UNKNOWN

Canopy is delegated design-build and MISSING structural construction details and information.

A-High
blueprint%20(2)_edited.png

A9.01

Finish Schedule

Architecture

MISSING

Materials missing from schedule and not found in other drawings

A-High
blueprint%20(2)_edited.png

A6.05

Stair Detail

Architecture

MISSING

Detail 13 : Structural elements not specified in structural drawings

A-High
blueprint%20(2)_edited.png

A7.03

Details

Architecture

DISCREPENCY

Detail 5 : Lintel in 6/S5.01 calls for non-glavanized steel

A-High
blueprint%20(2)_edited.png

S5.01

Details

Structure

DISCREPENCY

Detail 6 : Lintel in 5/A7.03 calls for galvanized steel

A-High
blueprint%20(2)_edited.png

S3.01

Concrete Section & Details

Structure

MISSING

Column Schedule : Some column size and other details missing from schedule

A-High
blueprint%20(2)_edited.png

A2.02

Upper parking Garage - P1 Level

Architecture

DISCREPENCY

Door P1-5.1 should open out. This would require moving the wall of room P1-3. Might impact electrical equipment in room P1-3.

A-High
blueprint%20(2)_edited.png

S4.22

Concrete Slab Sections & Details

Structure

MISSING

Detail 3 : Column rebar specification missing from schedule

A-High
blueprint%20(2)_edited.png

A3.04

Exterior Building elevations Courtyards

Architecture

MISSING

Keynote #9 : Missing clear material definition.

A-High
blueprint%20(2)_edited.png

A6.04

Elevator, Trahs Room, Trash Chute Plans and Sections

Architecture

DISCREPENCY

Elevator shaft wall is in discrepency with upper levels. See 9/A6.04 . Moving this wall might compromise the required 5'-5" clearance.

A-High
blueprint%20(2)_edited.png

A1.08

General - Fire Department and Construction Notes

Architecture

DISCREPENCY

For note #5 : Response time of 21 or 28) days for RFI's is in discrepency with industry standards.

A-High
blueprint%20(2)_edited.png

A2.02

Upper parking Garage - P1 Level

Architecture

DISCREPENCY

Elevator shaft wall is in discrepency with upper levels. See 9/A6.04 . Moving this wall might compromise the required 5'-5" clearance.

A-High
blueprint%20(2)_edited.png

A8.02

Window Schedule

Architecture

MISSING

Window Schedule Common Area : Window frame material missing from schedule.

A-High
blueprint%20(2)_edited.png

A8.02

Window Schedule

Architecture

MISSING

Window Schedule Units Levels 2-3 : Window frame material missing from schedule.

A-High
blueprint%20(2)_edited.png

AH11

1st floor plan

Arch/ID

INCOMPLETE DETAILS

Conflict to door between arch and ID

B-Medium
blueprint%20(2)_edited.png

A2.04

Ground Floor Plan

Architecture

DISCREPENCY

FEC is placed in metal stud wall, in discrepency with detail 10/A9.04. (occurs multiple times)

B-Medium
blueprint%20(2)_edited.png

A3.04

Exterior Building elevations Courtyards

Architecture

MISSING

Keynote #3 : Missing material

B-Medium
blueprint%20(2)_edited.png

A1.07

Floor Plan Notes

Architecture

MISSING

For notes #14 - 27 : Missing reference to details / sheets.

C-Low

blueprint%20(2)_edited.png

A4.06

Wall Sections

Architecture

DISCREPENCY

Detail 1 : Annotation not aligned with the actual drawing

C-Low

blueprint%20(2)_edited.png

A8.02

Window Schedule

Architecture

MISSING

Window Schedule Units Level 1 : Window details reference missing from schedule.

C-Low

blueprint%20(2)_edited.png

A8.02

Window Schedule

Architecture

MISSING

Window Schedule Units Levels 2-3 : Window details missing from schedule.

C-Low

blueprint%20(2)_edited.png

A4.06

Wall Sections

Architecture

DISCREPENCY

Detail 2 : Annotation not aligned with the actual drawing

C-Low

blueprint%20(2)_edited.png

A1.07

Floor Plan Notes

Architecture

MISSING

For notes #14 - 27 : Missing reference to details / sheets.

C-Low

blueprint%20(2)_edited.png